{"id":609,"date":"2012-08-15T14:58:31","date_gmt":"2012-08-15T14:58:31","guid":{"rendered":"http:\/\/facadesign.us\/blog\/?p=609"},"modified":"2012-08-15T14:58:31","modified_gmt":"2012-08-15T14:58:31","slug":"levolux-ikea-cardiff-uk","status":"publish","type":"post","link":"https:\/\/facadesign.us\/blog\/2012\/08\/15\/levolux-ikea-cardiff-uk\/","title":{"rendered":"Levolux IKEA Cardiff, UK"},"content":{"rendered":"<p>IKEA Cardiff was opened 38 weeks after starting on site, beating all IKEA construction records worldwide and is now being used as a benchmark for future stores. Protecting the glazed entrance area from overheating, Levolux and Stubbs Rich Architects developed a combination of horizontal and vertical shading to protect the double height glazed entrance area from overheating and showing us what could have been&#8230;<img decoding=\"async\" width=\"0\" style=\"display:none;border:0;\" src=\"http:\/\/tracker.sendible.com\/messages\/6e1c2fc2-22f5-4fed-97eb-bee4929402cc?service=Wordpress&#038;f=2072155&#038;view=true\" \/><\/p>\n<p><a href=\"http:\/\/bit.ly\/MZZP4K\"  title=\"1..3.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/MZZP4K\" alt=\"1..3.jpg\" title=\"1..3.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/SmRN28\"  title=\"1.1.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/SmRN28\" alt=\"1.1.jpg\" title=\"1.1.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/MZZQph\"  title=\"1.2.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/MZZQph\" alt=\"1.2.jpg\" title=\"1.2.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/SmRR26\"  title=\"1.4.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/SmRR26\" alt=\"1.4.jpg\" title=\"1.4.jpg\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>IKEA Cardiff was opened 38 weeks after starting on site, beating all IKEA construction records worldwide and is now being used as a benchmark for future stores. Protecting the glazed entrance area from overheating, Levolux and Stubbs Rich Architects developed a combination of horizontal and vertical shading to protect the double height glazed entrance area [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-609","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts\/609","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/comments?post=609"}],"version-history":[{"count":1,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts\/609\/revisions"}],"predecessor-version":[{"id":610,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts\/609\/revisions\/610"}],"wp:attachment":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/media?parent=609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/categories?post=609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/tags?post=609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}