{"id":301,"date":"2012-03-22T15:53:10","date_gmt":"2012-03-22T15:53:10","guid":{"rendered":"http:\/\/facadesign.us\/blog\/?p=301"},"modified":"2012-03-22T15:53:10","modified_gmt":"2012-03-22T15:53:10","slug":"burj-khalifa","status":"publish","type":"post","link":"https:\/\/facadesign.us\/blog\/2012\/03\/22\/burj-khalifa\/","title":{"rendered":"Burj Khalifa"},"content":{"rendered":"<p>The Burj Khalifa in Dubai measures 828 meters and simply blows all the superlatives apart. Topakustik won the contract to produce two sound absorbing ceilings finishes. The Chairman&rsquo;s Suite 152nd -154th floors uses Topperfo with a CLOU perforation and a high gloss paint finish. The Sky Lobby on the 123rd floor uses Topperfo as well with a Wenege Veneer. For more information visit http:\/\/tiny.cc\/5izsv<\/p>\n<p><img decoding=\"async\" width=\"0\" style=\"display:none;border:0;\" src=\"http:\/\/tracker.sendible.com\/messages\/625bd17d-c89d-4526-af9c-75b05a2358ec?service=Wordpress&#038;f=2072155&#038;view=true\" \/><\/p>\n<p><a href=\"http:\/\/bit.ly\/GHmg99\"  title=\"1.1.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/GHmg99\" alt=\"1.1.jpg\" title=\"1.1.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/GHmey7\"  title=\"1.2.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/GHmey7\" alt=\"1.2.jpg\" title=\"1.2.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/GHEOsl\"  title=\"1.3.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/GHEOsl\" alt=\"1.3.jpg\" title=\"1.3.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/GHmg9b\"  title=\"1.4.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/GHmg9b\" alt=\"1.4.jpg\" title=\"1.4.jpg\" \/><\/a><\/p>\n<p><a href=\"http:\/\/bit.ly\/GHmg9d\"  title=\"1.5.jpg\" ><img decoding=\"async\" src=\"http:\/\/bit.ly\/GHmg9d\" alt=\"1.5.jpg\" title=\"1.5.jpg\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Burj Khalifa in Dubai measures 828 meters and simply blows all the superlatives apart. Topakustik won the contract to produce two sound absorbing ceilings finishes. The Chairman&rsquo;s Suite 152nd -154th floors uses Topperfo with a CLOU perforation and a high gloss paint finish. The Sky Lobby on the 123rd floor uses Topperfo as well [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-301","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts\/301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/comments?post=301"}],"version-history":[{"count":1,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts\/301\/revisions"}],"predecessor-version":[{"id":302,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/posts\/301\/revisions\/302"}],"wp:attachment":[{"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/media?parent=301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/categories?post=301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/facadesign.us\/blog\/wp-json\/wp\/v2\/tags?post=301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}